- Hy-Rib can increase your productivity.
- Hy-Rib joint surfaces require minimal preparation prior to the next pour except for the rebar cover zones.
- Hy-Rib can be installed in less time than traditional materials such as plywood.
- Hy-Rib can be cut easily on site with disc cutters.
- Hy-Rib reduces the pore/water pressure on the construction joint by up to 50%.
- Hy-Rib support systems can be rationalised as a result of the lower pore/water pressures.
- Hy-Rib allows the pour to be visually monitored.
- Hy-Rib open mesh helps reduce the risks of voids and honeycombing by allowing the air to expel
through it whilst placing the concrete.
Hy-Rib can be fixed before or after reinforcement placement (ideal when an unexpected daywork joint is needed).
Hy-Rib enables a high rate of rise of concrete to be achieved.
Hy-Rib can be used in water retaining structures with or without water bar/stops.
|
|
Hy-Rib Grade |
Property |
Units |
2411 (Red) |
2611 (Green) |
2811 (Yellow) |
Weight per area |
kg/m2 |
6.34 |
4.32 |
3.39 |
Thickness |
mm |
0.79 |
0.50 |
0.40 |
Available lengths |
m |
2,3,4,5 |
2,3,4,5 |
2,3,4,5 |